Saturday, January 8, 2011
【 Weak current College 】 People's Republic of China public security industry standard tank truck General technical specifications---Power By 【 China power house network 】
People's Republic of China public security industry standard tank truck General technical specifications
People's Republic of China public security industry standard GA39.4 1 92 tank truck General technical specifications
1 topic content and scope of application of this standard provides for tank fire engine (tank car) technical requirements, test procedure, inspection rules and marks, package, transportation, storage and quality assurance. This standard applies to dissolve in the water tank. 2 reference standard GB7956 fire performance requirements and test method GB 6244 fire engine common chassis series, types, basic parameters and technical requirements of the fire control pump GB 6245 automotive performance requirements and test method GB 1334 trucks and off-road vehicle road test GB1496 motor vehicle noise measurement methods for GB 3181 film color standard sample GB4785 motor vehicles and their trailers external lighting and signalling devices of quantity, location, and light and color water hose GB6969 fire performance requirements and test methods for the safe operation of motor vehicles GB7258 specifications GB 8l08 automotive electronic alarm performance requirements and test methods GB9417 automotive product code rules JB787 car signage JB2864 automotive coating and chemical processing layer JB3689 truck brake systems road test JB4019 automobile brake performance requirements JB4020 automobile brake test method JB/automotive paint coating Z111 Ja/ZO 3011 engineering General technical requirements for mechanical welding ZBT50001 special vehicle approval test for ZBT50003 special vehicle road test ZB/TT50 005 special vehicle uses features of the code 3 terminology 3.1 sandwich-type power output device is installed in the clutch and transmission of power output device. 3.2 drive shaft-type power output device is installed in the shaft between the power output device. 3.3 trailer-type power output device is installed in the gearbox at the end of the power output device. 4 model 4.1 jugs car model designation should be consistent with GB9417 and TT50 ZB/005. 4.2 jugs car classification code phonetic alphabet representation. Fire extinguishing agent for the main parameter is used to assemble the total loading capacity (kg) divided by 100 indicates when the total loading capacity of not less than medium 10000kg, allows the use of three-digit. 4.3 tank cars model car number of pitcher mark example Shanghai fire equipment factory production of gun tank car gross weight to 9500 tons, the total loading capacity as agent, the model for 3600kg: SH X 5100G 36P X FSG. 5 technical requirements 5.1 General 5.1.1 tank cars comply with the provisions of this standard, and in accordance with the provisions, procedures approved drawings and technical documentation. 5.1.2 tank car chassis must be a national automotive industry departments of stereotypes of automobile chassis, or imported automobile chassis, and in accordance with the provisions of the GB 6244. 5.1.3 tank car fire pumps, water cannon and other main Assembly should go through accreditation, and in accordance with the provisions of the relevant standards. 5.1.4 water tank car fire performance shall conform to GB 7956. 5.2 vehicle 5.2.1 run Security specification for tank cars run security technical conditions should be consistent with the provisions of the GH7258. Test methods for per 6.4. 5.2.2 tank cars and spare parts of the Assembly should meet the following requirements: a. self-made parts subject to quality inspection departments inspection and acceptance mark; b £ ® outsourcing parts shall meet the relevant criteria, outsourcing parts outside parts should have certification and inspection by quality control Department, accompanied by a check mark. As technology changes, on the approval of the design department to agree and sign the batch; c £ ® material properties should be consistent with the national provisions relating to standards, and shall have a certificate or a warranty of quality. Substitution of raw materials subject to the approval of the design department agree and sign the batch. 5.2.3 structure parameters and quality parameters of tank cars main structural parameters and quality parameters should be consistent with section 2.1.2 GB7e56 provision. 5.2.4 number tank car occupant passenger count is 3 to 8 people (including drivers) that each crew and accoutrements total quality press 75kg meter. 5.2.5 maximum speed and Acceleration time tank car maximum speed and Acceleration time should be consistent with section 2.1.3 GBz956. 5.2.6 braking performance 5.2.6.1 tank vehicles braking performance shall be consistent with article 4.13 GBi258. Test method according to the provisions in article 6.5.1. 5.2.6.2 braking performance shall conform to the provisions of the GB4019. Test method according to section 6.5.2. 5.2.7 rain proof performance rain proof performance should be consistent with section 2.1.5 GB7956. 5.2.8 reliability reliability should be consistent with CB7956 2.1.6, its test mileage by 6.6. 5.2.9 indoor allow noise (not including alarm noise) cab, crew room the noise level is less than 85 dB (A). Measurement method by 6.7. 5.2.10 vehicle manufacturing and assembly requires all the outer surface of the casting 5.2.10.1 should be clean, not allowed to have holes, cracks, scarred, and so undermine the strength and the appearance of defects. 5.2.10.2 welding parts should be consistent with the JB/ZQ5011. 5.2.10.3 welding should close fitting and solid and reliable, rivets, should be neat and tidy is not allowed to have broken, loose, defects of deflection. 5.2.10.4 join parts, fasteners, self-locking devices should be strong, all kinds of pipe Assembly should be fixed toRely on. 5.2.10.5 black metal (stainless steel) fasteners should be galvanized, black or other anti-corrosion treatment. 5.2.10.6 parts coating and chemical processing layer should be consistent with the provisions of the JB2864. 5.2.10.7 body outside the skin should be smooth, circular arc transition should be smooth, the body sides and back plane of flatness and surface profile in 1000 × 1000mm "2 range not greater than 500 × 4mm, 500mm" 2 range not greater than 3mm. 5.2.10.8 crew room, pump room, tank and chassis joins should be solid and reliable, its vertical centre plane and the plane of longitudinal centre chassis should coincide, the error is not greater than 6mm. Measurement methods according to the provisions of article 6.8. 5.2.11 surface quality requirements 5.2.11.1 black metal (stainless steel) products shall be anti-corrosion treatment. 5.2.11. 2 body appearance the base color for the big red GB3181 R03, chassis coating original car paint colors, paint coating quality should be consistent with the provisions of the JB/2111. 5.2.11.3 entire exterior surface should be clean and beautiful, decorative pieces should be firm, smooth and should not be painted outside appearances is not allowed to have the paint. 5.3 engine system and power output device 5.3.1 engine cooling system should be consistent with section 2.1.7 GB7956. 5.3.2 the fuel tank of displacement or restructuring should meet the following requirements: a. the fuel tank of displacement or restructuring should be consistent with article 9.9 GB7258; b £ ® fuel tank capacity to meet water tank car driving mileage is greater than 300 km: c. filler must not be located in the passenger Interior and should come handy for oil properly. 5.3.3 reformed exhaust pipe should stay away from wires, bare electrical connectors, rubber products, from the fuel tank 300mm above. Exhaust pipe mouth shall point to the body right, tyres, fuel tank and the operator. 5.3.4 power output devices shall conform to the provisions in article section 2.1.8 GB7956 and shall automatically stop. 5.3.5 the power output device should give priority to the use of sandwich, drive shaft or trailer type. 5.4 crew room and car occupant compartment and cab 5.4.1 may in one room, cab and crew room, should have a call. 5.4.2 occupant interior decoration shall appear wrinkled pine, medicine is not strong, tear and other defects. 5.4.3 crew room flat on the floor to ceiling vertical distance between the highest point of not less than 1300mm. 5.4.4 occupant compartment floor should be formed, and dust control measures. 5.4.5 crew room seating arrangement should be reasonable, and meet the following requirements: a. seat spacing: same not less than 760mm; object-oriented than 1300mm (all two back at the bottom of the front of the minimum distance between). Wooden chair of Batten spacing should be less than 5mm; b £ ® seat cushion upper surface to ceiling vertical distance between the highest point of not less than 960mm; c. crew take shall be safety measures. 5.4.6 occupant compartment roof window should open and flexible, shutdown should have good sealing performance, shall open and close. 5.4.7 compartments should be set for security from top to bottom in the top of the climb, the car should take the non-slip steps, and can make the water naturally. 5.4.8 equipment box should be reasonably placed with the equipment, reliable clamping, convenience, and the drainage measures. 5.4.9 door passenger room and equipment shall conform to the following: the opening and closing a door. should flexible light and sealing, door lock should be solid and reliable, shall open and close. The door shall be flat and uniform; b £ ® hinged doors should be limited bit, occupant compartment door maximum opening should be not less than 75 °; the largest open door equipment should be not less than 90 °; c. sliding doors should be limited bit, and can open up to the total width of the door; d. curtain doors should be flexible to open and close the door should be can't open to four fifths of its own, shall be opened and whereabouts; e. on lift doors installed its support Rod should be solid and reliable, operation light. Manipulation of parts of the lift door on his opening height shall be not less than 750 mm (height from the ground). 5.4.10 glazing should be safety glass, glass hoist shall be flexible and reliable, does not have an elevator is not in place, their own whereabouts or broken, shutdown should have good tightness. 5.5 fire pumps and water pumps systems 5.5.1 5.5.1.1 fire pump performance shall conform to the provisions of the GH6245. 5.5.1.2 fire pump and engine power matching and speed ratio should be reasonable, its parameters are shown in Appendix A (for reference). 5.5.1.3 fire pump shall be capable of absorbing water through unilateral, the water reaches the rated flow and pressure (suction pipe with coil fire pump). 5.5.2 waterway system 5.5.2.1 waterway system performance should be consistent with section 2.2.1.l and GB7956 2.2.e-2.2.7. 5.5.2.2 fire pump suction port in the vehicle sides shall set up water on both sides of the vehicle, one-side suction port should not exceed 2. Fire pump shall be located at the mouth water strainer. 5.5.2.3 fire suction pipe diameter up to chase, water pipe sizes and quantities should be consistent with the requirements of the table 1. Table 1
┌----┬---------┬----┬---Rural │ │ fire pump rated flow suction pipe maximum nominal size │ outlet pipe nominal diameter │ min outlet--L/S │ │ │ │ │ mm mm a │ ├----┼-------------┼--┼---┤ │ 20, 25, 30 │ │ 100 80/2/2 65 │ │ │ ├-----------┼-┤ ├-----┤ │ │ │ │ │ │ 125 10 2/4 │├-----------┼-┤ ├-----150 50 │ ┤ │ │ │ │ │ │ ├ 4/6;----┤ │ │ │ │ │ │ │ 60, 80,100 │ │ │ └-----------┴---┴------------┴-¼ 5.5.2.4 fire water hose performance shall conform to the provisions of the GH6969. 5.5.2.5 fire pump outlet pipe, pressure parts shall be subject to hydrostatic pressure strength test, the test pressure pipes withstand the maximum working pressure values 1.5 times, test method according to the provisions in article 6.9 shall not appear rupture, leakage and residual deformation. 5.5.2.6 fire pump outlet pipe road system should have good sealing performance, subject to the hydrostatic pressure seal test, the test pressure to pipeline the maximum working pressure values 1.1 times, test method according to the 6.10 shall occur throughout the pipeline leakage. 5.5.2.7 in fire pump and piping system shall have a minimum on EU water facility. 5.5.2.8 jugs to fire pump inlet pipe should be able to meet the pump rated flow and pressure. 5.5.3 the running-in period of hydraulic performance running-in period of tank car hydraulic performance parameters and test methods are provided in Appendix B (reference). 5.5.4 jugs 5.5.4.1 cans be corrosion-resistant materials or inner surface, anticorrosive treatment. Steel cans are delivered using five years does not affect the use of the allowed leakage; composite cans in the delivery of 10 years is not allowed to have influence with leakage. 5.5.4.2 tank should have sufficient strength and tightness, water pressure strength test, 20kpa tank two side shall appear clearly residual deformation; connected by piping, valves are not allowed to have the leakage. Test method according to the provisions in article 6. ll. 5.5.4.3 pitcher shall set liquid level indicator and overflow devices; tank bottom outlet shall be set; larger than the pitcher should fortification 2000L plaster partitions. 5.5.4.4 tank shall be provided at the top into the hole diameter is not less than 400mm. 5.5.4.5 tank capacity tolerance: capacity greater than or equal to ± 2 when 12000L, capacity in the following, capacity 12000L each reduction of 1000L, its tolerance 0.1 per cent increase in absolute terms. 5.5.4.6 jugs of water injection device shall be provided. 5.6 water cannon 5.6.1 water cannon's performance should be consistent with section 2.2.8 GB7956. 5.6.2 water cannon's flow tolerance of ± 8%. 5.6.3 water cannon over current surface should have anti-corrosion performance. 5.6.4 water cannon block bearing parts by hydrostatic pressure strength test, the test pressure is part of the maximum working pressure of 1.5 times, test method according to the provisions in article 6.9 shall not occur rupture, leakage and residual deformation. 5.6.5 in the spray gun connection may not appear leakage phenomenon. 5.6.6 water monitor should be set for locking or support agencies. 5.6.7 gun body should be able to manipulate the horizontal Rotary, hand gun can automatically rotating 360 °, control of the gun back angle is not less than 270 ° angle of not less than 45 °, dip angle of not less than 15 °, manipulation should be flexible, convenient and reliable. 5.7 manipulation and instrument monitoring system 5.7.1 waterway system in operation handles should set the appropriate indicator. 5.7.2 the control mechanism should be portable and reliable, automatic control bodies should have the emergency measures. 5.2.3 tank car should have instrument monitoring system and housed in the ease of observation and control. Instrument monitoring system should have the following instrument: a. fire pump pressure gauge (precision 2.5); b £ ® fire pump vacuum table (precision 2.5); c. fire pump speed table; d £ ® liquid level indicator. 5.7.4 hand throttle should be easy to operate, and maintain the throttle or rack to work in the location you specify. 5.8 electrical system 5.8.1 tank car all electrical equipment shall not exceed the total power generator rated power of 1.4 times. 5.8.2 licence light Gallery shall conform to GB 4785 article 19. 5.8.3 tank car should set up a full range of the scene work lights. 5.8.4 crew room, manipulate the a dashboard, pumping stations, equipment enclosures, etc. shall be light. 5.8.5 tank car should install electronic alarm and red lights. Electronic alarm performance shall conform to GB 8108. 5.8.6 electrical line should meet the following requirements: a. vehicle electrical system and fire protection equipment uses electricity system shall be divided into insurance or power off switch; b £ ® vehicle electrical lines should be neat and tidy, fixed and reliable, and prevent a short circuit or open circuit; c. additional power line conductor cross-sectional area should match the maximum load. Stranded conductors should be wrapped into the unit, the conductor, there should be a number or a different color. Connections should be made using connectors. 5.8.7 battery replacement should be well ventilated, and easy maintenance. 5.9 tools, attachments, accessories and equipment for 5. 9.1 in visible, accessible and convenient location of fire extinguishers should be configured. 5.9. 2 equipped with tools and accessories should be consistent with the provisions of the relevant standards. 5.9. 3 equipped with tools and accessories should be firmly clamping, convenience. 5.9. 4 equipped with the tools and accessories should be consistent with the requirements of the table 2. 表2 ┌──┬──┬──────────────┬──┬───┬───────┐ │类别│序号│名称 │单位│数量 │备注 │ ├──┼──┼──────────────┼──┼───┼───────┤ │灭火│1 │消防吸水管 │m │>8 │ │ │装备├──┼──────────────┼──┼───┼───────┤ │ │2 │滤水器│件 │1 │ │ │ ├──┼──────────────┼──┼───┼───────┤ │ │3 │消防水带φ65,φ80 │m │>240 │ │ │ ├──┼──────────────┼──┼───┼───────┤ │ │4 │分水器 │件 │1 │ │ │ ├──┼──────────────┼──┼───┼───────┤ │ │5 │集水器 │件 │1 │ │ │ ├──┼──────────────┼──┼───┼───────┤ │ │6 │异径接口 │件 │2 │ │ │ ├──┼──────────────┼──┼───┼───────┤ │ │7 │同型接口 │件 │1 │重型联用车选配│ │ ├──┼──────────────┼──┼───┼───────┤ │ │8 │水带包布 │件 │4 │ │ │ ├──┼──────────────┼──┼───┼───────┤ │ │9 │护带桥 │副 │1 │ │ │ ├──┼──────────────┼──┼───┼───────┤ │ │10 │水带挂钩 │件 │2 │ │ │ ├──┼──────────────┼──┼───┼───────┤ │ │11 │地上消火栓扳手 │件 │1 │ │ │ ├──┼──────────────┼──┼───┼───────┤ │ │12 │地下消火栓扳手 │件 │1 │ │ │ ├──┼──────────────┼──┼───┼───────┤ │ │13 │消防吸水管扳手 │件 │2 │ │ │ ├──┼──────────────┼──┼───┼───────┤ │ │14 │泡沫液桶 │只 │1 │选配 │ │ ├──┼──────────────┼──┼───┼───────┤ │ │15 │空气泡沫枪 │支 │1 │选配 │ │ ├──┼──────────────┼──┼───┼───────┤ │ │16 │消防水枪(开关及多功能水枪)│支 │3 │ │ │ ├──┼──────────────┼──┼───┼───────┤ │ │17 │单杠梯 │副 │1 │带固定炮消防车│ │ │ │ │ │ │选配 │ │ ├──┼──────────────┼──┼───┼───────┤ │ │18 │拉钩 │副 │1 │带固定炮消防车│ │ │ │ │ │ │选配 │ ├──┼──┼──────────────┼──┼───┼───────┤ │ │19 │火钩 │件 │1 │带固定炮消防车│ │ │ │ │ │ │选配 │ │ ├──┼──────────────┼──┼───┼───────┤ │破拆│20 │铁锹 │件 │1 │ │ │救生├──┼──────────────┼──┼───┼───────┤ │工具│21 │丁字镐 │件 │1 │ │ │ ├──┼──────────────┼──┼───┼───────┤ │ │22 │消防腰斧 │件 │1 │ │ │ ├──┼──────────────┼──┼───┼───────┤ │ │23 │铁挺 │件 │1 │ │ ├──┼──┼──────────────┼──┼───┼───────┤ │消防│24 │隔热服 │套 │1 │选配 │ │员 ├──┼──────────────┼──┼───┼───────┤ │装备│25 │空气呼吸器 │件 │1 │选配 │ └──┴──┴──────────────┴──┴───┴───────┘ 6 试验方法 6.1 试验前的准备工作 应符合ZBT50 003第2章的规定。 6.2 vehicle appearance, manufacturing and Assembly quality check check vehicle appearance, manufacturing and Assembly quality, and its result shall conform to 5. 2.10, 5.2.11, 5.3, 5.4, 5.7, 5.8, 5.9. 6.3 vehicle and fire protection performance test vehicle, fire pumps and waterborne systems performance test method GB 7956 provisions of the chapter, 3.4, except that its 3.7 result shall conform to 5.2.3, 5.2.5, 5.2.7, 5.3.1, 5.3.4, section 5.5.2.1. 6.4 run security tests conducted by GB 7258, and its result shall conform to the provisions of section 5.2.1. 6.5 braking performance test 6.5.1 running brake test conducted by JB 3689, and its result shall conform to the provisions of article 5.2.6.1. 6.5.2 braking performance test conducted by JB4020, and its result shall conform to the provisions of article 5.2.6.2. 6.6 reliability test GB 7956 3.6, mileage, road types and mileage distribution according to table 3 provides that the results should break-5. 2. the provisions of article 8. Table 3-┌-┬--┬--------------rural classification │ │ test mileage │ road types and mileage distribution--│ ├---┬--┬--┤ │ │ │ │ │ uneven road, good mountain highway │ │ ├-Highway-┼--┼---┼--┼--shaping-┤ │ │ │ │ │ inspection of 1200 1200 3000 │ │ │ │ │ │ ├-600-┼--┼---┼--┼--periodic inspection │ ┤ │ │ │ │ │ 300 100 100 100 │ │ │ ├--┼--┼---┴--┴--┤ │ │ factory inspection 30 ~ 50 │ │ └ 30 ~ 50--┴--┴---------------¼ 6.7 indoor noise measurement methods for indoor noise tests conducted by 1496 GB, and its result shall conform to the provisions of section 5.2.9. 6.8 occupant compartment, pumping stations, water tank on the longitudinal centre plane of the chassis measuring GB 1334 Chapter 3, the provisions of article 15, and its result shall conform to the provisions of article 5.2.10.8. Hydraulic pressure parts 6.9 strength tests will be on parts fixed on the test bench, filled with clear water, no residues in air, and slowly boost to the test pressure, keep 3min 5.5.2.5, result shall conform to the provisions of section 5.6.4. 6.10 fire pump outlet pipe road system sealing performance test will fire pump outlet check valve after the outlet pipe road full of water, no residual air, the water valve is closed, use force pump to the pipeline in the slow compression; provisions to be pressure to maintain 3min after, the result shall conform to the provisions of article 5.5.2.6. Water leakage checks off 6.11 jugs all entrances, the tank filled with water, in water (or other entrances) to use force pump to the tank pressure, tank pressure rise provides value, keep the martensii 3min, observation, the result shall conform to the provisions of article 5.5.4.2. 7 inspection rules 7.1 inspection category 7.1.1 setting inspection 7.1.1.1 where one of the following train inspection should be carried out to identify stereotypes can be put into mass production. The prototype for the inspection type 1 ~ 2. A. upon completion of the new product trial manufacturing; b £ ® old products go factory production. 7.1.1. 2 the conditions of implementation of the inspection type by ZBT50 001 2.2 and 2.3 section 7.1.2 training program by ZBT50001 Chapter 3. 7.1.2 periodic inspection 7.1.2.1 where one of the following, should be regularly inspected, periodic inspection of the vehicle for 1-2. A. discontinued two years production of products; b £ ® normal production of the product after two years. 7.1.2.2 in product testing, as long as there is an indicator of unqualified, it should be in the same group of products in the double quantity reinstall Project examination and, if still not qualified, you should stop the inspection, the items are not eligible. 7 · 1 · 3 factory inspection, tank cars must be carried out in accordance with the set project, factory inspection inspection by quality control Department and product certificate will be issued only after the factory. 7.1. 4 product performance testing of products after the change was formally put into production after design, process or material change and the impact on performance, according to the actual situation by the competent authorities decided to test categories. 7.2 inspection items jugs car train inspection, periodic inspection and delivery inspection projects and content provided by table 4. Table 4 ┌-┬----┬-------------┬--┬--┬-ordinal-rural │ │ │ │ │ inspection content inspection items │ │ │ │ periodic inspection train inspection │ │ │ │ ├ factory inspection-┼----┼------------┼--┼--┼-1-┤ │ │ │ vehicle appearance, manufacturing │ 5.2.10.5.2.11, 5.3, Δ Δ │ │ │ │ │ │ │ │ │ │ and Assembly quality check, 5.7, 5.8 5.5.4, 5.9 │ │ │ │ ├-┼----┼------------┼--┼--┼-2-┤ │ │ │ │ │ main structural parameters and a service quality and axis PCT contained Δ Δ quality │ │ │ │ │ │ │ │ │ │ b quality parameters determination. laden mass and axle load Δ Δ quality │ │ │ │ │ │ │ │ │ C £ ® centroid location Δ Δ │ │ │ │ │ │ │ │ │ │ │ d £ ® extinguishing agent load Δ Δ │ │ │ │ │ │ │ │ e £ ® overall dimensions Δ Δ │ │ │ │ │ │ │ │ f. driving point Δ Δ │ │ │ │ │ │ │ g. minimum turning radius │ │ │ │ │ │ Δ │ │ h. minimum ground clearance │ │ │ │ ├ Δ-┼----┼------------┼--┼--┼-3-┤ │ │ │ │ │ a basic performance test. maximum speed │ │ │ │ │ Δ │ │ │ │ │ │ b £ ® acceleration Δ │ │ │ │ │ │ │ │ c £ ® braking performance Δ Δ Δ │ │ │ │ │ │ │ │ d £ ® maximum climbing │ │ │ │ │ Δ │ │ │ │ │ │ e. noise Δ Δ │ │ │ │ │ │ │ │ │ f. emission Δ Δ │ │ │ │ │ │ │ g. rain proof performance Δ Δ │ │ │ │ │ │ ├-┼----┼------------┼--┼--┼--┤ ¦ 4 ¦ reliability test │ a.3000km running test │ │ │ │ │ Δ │ │ │ │ b.300kmAnd running test Δ │ │ │ │ │ │ │ │ │ │ │ f. emission Δ Δ │ │ │ │ │ │ │ c.30 ~ 50km running test │ │ │ │ │ ├ Δ-┼----┼------------┼--┼--┼-5-┤ │ │ │ │ │ the fire performance of fire pump performance a.; Δ │ │ │ │ │ │ │ │ │ b £ ® outlet pipe road tightness; Δ Δ │ │ │ │ │ │ │ │ │ │ c. diversion time of vacuum and sealing Δ Δ │ │ │ │ │ │ │ │ │ d £ ® diversion time and reliability; Δ Δ │ │ │ │ │ │ │ │ e. continuous working time Δ Δ │ │ │ │ │ │ │ │ f. overload; Δ Δ │ │ │ │ │ │ │ │ g. ramp-hydraulic performance test │ │ │ │ │ │ h Δ. water monitor performance test Δ Δ │ │ │ │ │ │ │ │ │ f. emission Δ Δ │ │ │ │ └-┴----┴-----------------┴ ┴--┴--¼ Note: "△" as required inspection items. 8 marking, packaging, transportation, storage 8.1 signs 8.1.1 product 8.1.1.1 product's shape and size should be consistent with the provisions of the JB 787. 8.1.1.2 product should be seated in the cab of the left door. 8.1.1.3 product shall have the following: a. product name and model number; b £ ® fire pump flow; c. water tank capacity; d £ ® factory number; e. date of manufacture; f. manufacturer's name. 8.2 packaging 8.2.1 products manufactured should match all the following technical papers, and proper packaging: a product certificate (with chassis); b £ ® product operation manual (including chassis); c £ ® on-board tools, attachments manifest; d £ ® quality warranty. 8.2.2 all doors, door should close equipment lock or seals. 8.2.3 chrome fittings be exposed anti-rust coating, exterior lights, lights applied plastic film dressings. 8.2.4 engine, more water fire pumps shall not, shall not be more than oil fuel tank, battery polarity connectors should be disconnected. 8.3.1 Introduction to traffic transport 8.3 transport shall comply with the instruction manual for the new car. 8.3.2 uses iron (water), road transport, railway (water) with the relevant provisions of the road transport. 8.4 storage tank car need long-term storage, fuel and water. Parking in fire, rain, Sun and well-ventilated place and, in accordance with the provisions of the product manual for maintenance and upkeep. 9 quality assurance 9.1 user acceptance of products can be provided by the standard factory inspection project check but not demolished the seizure. 9.2 users in compliance with the manufacturer of the product usage manual under the conditions provided for in the product since the delivery within one year from the date, the ill is due to the manufacturing quality and damage, or is not working, and have the quality warranty card records are available, factory should be freely to repair or replace parts (excluding wear parts). Chassis parts of quality issues, responsible by the chassis manufacturer. Appendix A fire pump and engine power and speed than selecting (reference) A1 fire pump and engine power matching fire pump shaft power and engine power ratio: recommended gasoline engine is not more than 60 per cent and not more than 65% of the diesel engine. A2 speed than choice. Power output device for growth is not less than: recommended fire pump rated speed and engine rated speed ratio 1.21 times. I.e.: I ≥ 1.21n pump sales amount in/n FA: I--power output devices accounted for; n pump places--fire pump rated speed, r/min; n amount of hair--engine rated speed, r/min; Appendix B tank car running-in period of hydraulic performance (reference) B1 tank car running-in period should be consistent with the hydraulic performance table E1 requirements. Table B1 ┌----------------------┬----------------rural │ │ │ │ │ ├ project indicators-------------------------┼-------------┤ │ maximum vacuum, ≥ 70 kPa; │ │ │ ├--------------------------┼-------------┤ │ diversion device sealing (1min landed value in vacuum), kPa │ │ ├ ≤ 2.6-------------------------┼-------------┤ │ │ diversion time, s is not more than the first section 2.2.5 GB7956 value 1.3 │ ├--------------------------┼-------------┤ © fire pump flow rate, L/S │ │ ├ = 50%--------------------------┼-------------│ ┤ fire pump outlet pressure, kPa │ ≥ 50% Pn "2 ||-------------------------┴-------------¼ Note: l) fire pump rated flow. 2) fire pump outlet pressure. B2 tank car running-in period of hydraulic performance test method B2.1 vacuum diversion device and tightness, water diversion time and reliability of the test methods by GB7956 3 £ ® 8 and 3.9 provisions; the result should be consistent with the requirements of the table B 1. Test conditions shall be carried out under standard conditions, you should press section 3.1.1 GB6245 and 3.1.2 of the aspiration of deep and diversion into the vacuum degreeLine fixed. B2.2 fire pump flow and the outlet pressure of the tank car powered B2.2.1 with water filters of suction pipe, water absorbing deep within 3m (water filters shall be completely submerged in the water). The tank car outlets connected 5m long lined hose, hose end connected to the water gun or flow meter (if using a water gun flowmeter flow, the available standard water gun instead), water gun count and size according to the flow of the pump. B2.2.2 pump outlet pressure with pressure gauge measurements, calibration of flow with a water gun flowmeter or other flow meter, thermometer for temperature measuring, measuring of the pump speed tachometer. B2.2.3 started the fire pump, adjustable pump rotational speed and export the valve opening, so that the pump outlet pressure and flow reaches the specified value, the question to start the timing after running stable, continuous operation, the testing process shall 30min. The result should conform to the requirements of the table B1. Additional explanation: this standard by the Ministry of public security fire equipment management office. This standard by the National Fire Protection Committee of Standardization Technical Committee of the Fourth Division posted. This standard by Shanghai fire equipment factory is responsible for drafting, Ministry of public security fire equipment management office, the fire fight Science Graduate School of Shanghai, the Conservancy fire equipment factory, Hubei fire equipment factory, Shangdong linyi shengjian machinery factory took part in the drafting.
Labels:
[:]
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment