【 Weak current College 】 fire engineering maintenance content and implementation of the programme
Fire service, fire system play normal function of protection. My company maintenance center in accordance with the State of the automatic fire alarm system construction and acceptance of GB, the automatic sprinkler system installation and acceptance of GB, the automatic fire-fighting facilities and buildings fire control room standardization management standard, specification, combined with the owner of the equipment and management requirements, so that the entire maintenance work system and standardized, archives, the entire device system good run, a complete easy to use and meets the infallible when police. Maintenance plans are formulated as follows:
1. fire-fighting system maintenance construction preparation
1, design and fire protection systems-dimensional map. Read the party a to provide information on various types of drawings, familiar with party a fire-fighting equipment, fire-fighting water status.
2. meeting with stakeholders to develop maintenance inspection program.
3. establish the duties of the fire service duty staff "," fire control room management system, fire-fighting facilities maintenance management system, fire management regulations.
4. fire-fighting facilities testing instruments and maintenance tool in place.
5, maintenance personnel per card for posts.
Second, the fire system checks and maintenance methods
(A) automatic fire alarm system
1. quarterly using special instrumentation test batches and confirm detector movements are normal.
2. with the consent of the owner, test fire alarm sound and light work is normal.
3. test flow indicators, pressure switch, alarm function, signal display.
4. on standby power for 1-2 times the charge and discharge test, 1 – 3 main and standby power switch test.
(Ii) automatic sprinkler system
1. monthly checks once a fire water tank level, confirm whether the normal water level indicators.
2. each peer on fire water supply control valve sealing or chains of inspections to confirm that all control valve is opened.
3. monthly on the fire pump with filter interface and attachments check to confirm that the interface is intact, no leakage, plug.
4. monthly inspections head, clear the obstructions, found not normal nozzle timely replacement.
5. monthly on fire pumps make a start on the run.
6. each month on a rinsing pipe network, ensure that the water tubes without dirt free.
7. each of the two-month use eqnipment on flow indicator for a check to confirm that the alarm properly.
8. each quarter on wet alarm valve valve, the water next to a water test to confirm that the alarm properly.
9. quarterly on outdoor valve, inlet control valve inspections ensure that is opened.
(3) fire control linkage system
Quarterly on the following devices make a linkage work check:
1. check spray pump the linkage work.
2. check the fire-fighting facilities of toggle switch properly.
3. check the linkage of fire pumps.
4. fire doors, anti-theft shutter system linkage work.
5. smoke control system linkage work
6. automatic elevator is the first layer.
(4) fire hydrant system
1. monthly check indoor hydrant bolt head leakage, switch is flexible, the component is complete.
2. monthly on roof leak test plug test and fire hydrant button starts the fire pump, water-supply system of experiment-pressure.
(5) fire safety lighting, evacuation instructions system
Regular emergency lighting and evacuation led a charge and discharge, and record to the party.
III. construction method and the quality certificate of quality system
1. maintenance staff should be familiar with the fire engineering system works and the methods of operation.
2. maintenance staff should be aware of fire-fighting system main equipment installation location and source.
3. water supply for fire-fighting system for status control valve.
4. maintenance personnel and party a fire watch closely, guide, assisting managers do a daily check.
5. party a duty officer in the routine inspections, ensure that all fire protection systems of water supply network is full of stress, the sprinkler system of the most negative point pressure greater than 0.05MPa, unusual, you should promptly notify maintainers.
6. monthly, quarterly, and annual inspection found network there is leakage, block or receiving party managers notification system exception, you should check the processing time. Equipment devices have a problem, you need to replace the maintenance must be processed as quickly as possible, without undue delay.
IV. safety measures
1. monthly, quarterly, and annual inspection conducted prior to the party a written notice issued by, and notify each floor staff, so as to avoid unnecessary interference and misunderstanding.
2. maintenance personnel screening devices, you must notify party a duty officer.
3. system maintenance, power, water and should be addressed to the party leadership report, consent and sent for site supervision, strengthening preventive measures can start in the rear.
4. fire fighting equipment for testing, you should clear the device around the debris to prevent independent access to the site.
5. construction organization
1. monthly checking 12, at the end of each month, the time agreed with the buyer.
2. quarter checked 4 times.
3, 1st annual inspection. To the end of this year's annual fire engineering maintenance work, inspections by one year of maintenance, attention problems, research questions to pose to the masters of science, party a reasonable proposal.
4, company maintenance center/24-hour hotline service, emergency Beck.
5. the above checks, if it is discovered that the issue should be dealt with in a timely manner, keeping the system up and running, all device full easy to use.
6, each inspection is completed, the production of the inspection report, the two parties signature endorsement, shall be communicated to the competent authorities of the area of fire protection, each party a copy of, the establishment of annual maintenance records.