Thursday, December 23, 2010
【 Weak current college 】 building fire supervision audit
The first section of the audit of the time-limit pursuant to and
I. regulations pursuant to
1, the fire service law, People's Republic of China in 1998, 9 1 January;
2. the architectural engineering fire supervision audit management regulations ", from 1 March 1997.
Second, technical standards and specifications
1, the "architectural design fire protection standard
2. the high-rise construction design fire protection standard "
3. the defence works design fire protection standard "
4, the garage design fire protection standard "
5. the construction interior trim design fire protection standard "
6, the petroleum chemical industry enterprise design fire protection standard "
7. the construction of fire extinguishers configuration design code, etc.
3. audit time requirements
1. public security and fire fighting supervisory body to review the design of building fire shall promptly examine, from the registration date of your map, General Engineering, in 10 countries, provincial key construction projects, as well as the settings architecture automatically fire facilities construction work should be issued within the 20 "architectural engineering design review submissions on fire. Need to organize experts design project, can be extended to 30 days. Within a specified time period no reply, i.e. as consent.
2. public security and fire fighting supervisory body in receipt of construction units, fire inspection should be identified building fire-fighting technology test reports and other documents certifying that the materials are complete,
It should be in the 10 days according to the national fire technical standards for fire protection and fire acceptance within seven days after the issuance and acceptance of the construction works fire. submissions
IV. legal instruments
1. design of the fire; fire safety audit
2, the construction interior trim fire safety audit;
3, automatic fire-fighting facilities design fire safety audit;
4, building works fire acceptance declaration form;
5, building works fire design review submissions;
6, construction engineering fire submissions and acceptance;
7, order the suspension notice to stop using the rectification;
8. review the submissions.
The second section of the relevant units of responsibility
First, the responsibility of building units
1, construction unit should be new and reconstructed, expansion, construction interior trim, and use the change project fire design drawings and information sent to public security and fire fighting supervisory body audits, and fill in the appropriate design of the building fire fire safety audit report form, the automatic fire-fighting facilities design fire safety audit returns "or the construction interior trim design fire safety audit report form on the approval of the audited before starting construction.
2, building units in the building construction process, you should seriously implement national fire regulations and technical standards and specifications. And has the responsibility to check the design organizations and construction unit to implement the fire Statute.
3, project completion, construction unit should provide the firefighting supervisory authority made application for, acceptance of engineering fire service fire facilities technical test report, complete the construction of fire acceptance Declaration ", and to organize fire acceptance. Fire inspection unqualified, construction unit shall not be handed over, the owner of a building shall not receive.
Second, the responsibility of the design company
1, design units in carrying out the project at design time, you must implement the national fire protection technology standards and other engineering construction standard for fire protection design requirements.
2, national and provincial level key engineering and other settings for the automatic fire-fighting facilities construction design should prepare fire design zhuanpian.
3, design units shall, in accordance with the building fire safety design audit submissions on modifying the design drawings.
4, design unit should establish responsibility for the fire protection design, establishing fire protection design technology leaders review system, anyone who does not comply with the technical standards of engineering design should not be issued.
5, design units shall organize project designers learn, master, national fire technical standards, in building works actively in the fire protection design, advanced fire-fighting technology.
III. the responsibility of the construction unit
1. construction and installation units must be in accordance with the approved design drawings to install fire protection shall not be tampered with.
2, equipped with automatic fire-fighting facility construction project, completed in engineering, construction and installation units must entrust qualified building fire facilities detection unit for technical testing, and building fire facilities technical test report.
3, fire control and acceptance of construction engineering, and construction units shall not be used for completion and delivery.
IV. the responsibility of users of the building
1. after completion of construction works, the public security and fire fighting supervisory body acceptance, the building owner or Manager may receive.
2, building owner or manager should develop a fire safety management regulations that implement the fire facility managers and watchkeeping officers.
3, and building fire facilities maintenance Enterprise signed a building fire facilities, regular maintenance contract to ensure the normal operation of fire fighting facilities.
Section III overview
First, the significance of examination work
1. to supervise the construction engineering construction, design, construction units in the construction process, seriously implement national fire regulations and technical specifications, strengthen the management of the building fire safety work.
2, to effectively implement the construction of fire safety measures to prevent fire or effectively prevent fire spreading, to create conditions that put out the fire in a timely manner.
3, can detect and eliminate architectural engineering fire hazard.
Second, the scope of examination work
The following project fire design review, construction and installation supervision and inspection and acceptance: fire protection
1. create a new, expanded and reconstructed construction works
2. construction interior decoration works
> 3, use the change in architectural engineering
Section IV the content and procedures of the audit
1. architectural engineering fire supervision audit of main content
1. the General layout and floor covering fire safety in the fire separation, fire engines, fire-fighting water and road;
2. construction of the fire risk categories and fire-resistant grade;
3, building fire smoke partition and architectural structures;
4. elevator evacuation and fire;
5. fire-fighting water supply and automatic fire extinguishing system;
6, smoke, smoke extraction and ventilation, air conditioning system design of fire;
7, fire power supply and distribution;
8, fire, emergency lighting, emergency broadcasting and evacuation signs;
9, automatic fire alarm systems and fire control rooms;
10, construction interior trim design of fire;
11, building fire extinguishers configuration;
12, have the explosion of a, b building explosion-proof design;
13, national engineering construction standard for fire safety design of other content.
2. architectural engineering fire supervision audit program
1, construction unit holders of engineering design drawings and design documents, and completing the building fire safety design fire protection audits returns to public security and fire fighting supervisory body to declare the audit;
2. public security and fire fighting supervisory body examination departments identify the building fire safety design fire safety audit report form and engineering design drawings and design documents, in line with the Declaration of acceptance of the conditions of registration. Examination departments according to specialization, to declare construction engineering conduct audit (site survey), and value applied to the building fire safety design audit submissions;
3, design units under the building fire safety design audit opinion on the revised design;
4. construction construction according to design drawings;
5. public security and fire fighting supervisory body according to the progress made during the course of supervision and inspection;
6, construction completed, fire-fighting facilities and construction units must delegate the fire facility inspection unit tests (no automatic fire-fighting facilities except for construction projects);
7. the construction units holding fire facilities test report and fill in the Declaration of acceptance of construction engineering fire "to public security and fire fighting supervisory body for fire acceptance;
8. public security and fire fighting supervisory body with the relevant units or departments for fire acceptance. And fill in the submission and acceptance of the construction of fire;
9, construction unit organization units on the building works in fire acceptance submissions raised issues for rectification;
10. If acceptance of the construction of fire "agreed to put to use the submissions may be made to the delivery of building users.
Labels:
[:]
Subscribe to:
Post Comments (Atom)
No comments: