【 Weak current College 】 gas detection alarm security management regulations
The first application of flammable gas detection alarm (alarm) monitoring production site of combustible gas leak and accumulation, the prevention of explosion of the important means, must be integrated into system administration.
The second must enhance the use and management of alarm, alarm installation, usage, good rate reaches 100%.
3 select the alarm should have conditions
1, the function, structure, performance and quality should be consistent with the requirements of national law.
2, access to national legal measures issued and measurement instruments production license.
3, take the State specified explosion-proof Inspection Department issue of explosion-protection certificate of conformity and installation on site of the explosion-proof grade required.
4, advanced technology, stable quality, responsive, easy maintenance, ensure that the supply of spare parts.
5, affected by the interference of other gases, by the effect of temperature and humidity.
6, after the promulgation of the standards, strict implementation of national standards.
IV where a new, expanded and reconstructed production installations and storage systems are combustible gas leak accident, you must press the construction design, while at the same time, while acceptance of "three at the same time" principle is equipped with alarm. The introduction of the project and domestic support must be in accordance with this principle is equipped with alarm.
5 alarm settings location, quantity, should refer to similar devices at home and abroad, equipment, based on the experience and equipment to perform the actual situation.
6 alarm installation site of the:
1. possible leakage of combustible gas density.
2, outdoor installation should consider leading wind and other environmental factors.
3, rain, and toxic gases on the detection of an original.
7 alarm verification standard calibration apparatus, gas, calibration and validation personnel recruitment is located at the city level metering sector's written permission.
8 alarm for factory, workshop, teams of three-level management, professional management to mobile office, security, technology, measurement, instrumentation, and other functional departments jointly responsible.
9 the management sector must seriously developed the following systems:
1, alarm management, inspection, scrap, update, remove, deactivate, temporarily deactivate and acceptance system.
2. mandatory periodic inspection and calibration of the system.
3, the maintenance and overhaul of the system.
4. the personnel training system.
Article 10: the management of work tasks:
1, mechanical (metering) Department is responsible for the Organization of existing production equipment for the construction of the new alarm and putting-in front of the acceptance inspection, is responsible for the alarm (quarter) of overhaul, technical measures plan and audit for alarm health and maintenance, maintenance of quality inspection, is responsible for alarm operation index (installation, usage, good rate) examination ratings for normal business.
2. quality and safety and environmental protection agency to participate in additional alarm review and acceptance check before putting-, responsible for troubleshooting, deactivate, temporarily deactivate review and for the record, is responsible for putting the alarm, management, supervision and maintenance work. And is responsible for the selection of the new device alarm, set the work programme.
3. instrument workshop should specify tracks, the specialist is responsible for the maintenance, checking of alarm, sound archives.
4, production workshop of operations personnel must understand alarm performance, theory, and will operate the use.
Article 11 to alarm the factory organization and leadership enrichment technology power and maintenance staff, improve the necessary calibration tools.
12 factory established under this system, and the rules for the implementation of the integrated economic accountability assessment scope.
Article 13 of the application and management of the alarm, because negligence causing loss of units and individual, depending on their circumstances are given.