Plant fire safety regulatory requirements
Article 1 in order to strengthen the supervision and management of nuclear power plant fire safety, prevention of fires and to reduce fire hazard, the protection of citizens ' life and property safety and public security, fire under the People's Republic of China and the State Council needed to retain items establishing administrative decision "(Decree No. 412 of the State), the enactment of this provision.
The second nuclear power plant design, construction and operation of the fire safety supervision and management, application of this provision.
Article 3, the fire safety of nuclear power plants, should implement prevention, anti-binding approach, following the strict supervision of the defense in depth, in principle, the responsibility for fire safety.
IV National Defense Science, technology and Industry Committee (hereinafter referred to as Defense) on the implementation of the national nuclear safety, the consolidated supervision of the provinces, autonomous regions and municipalities directly under the National Defense Science, technology and industry management sector (hereinafter referred to as provincial authorities) in accordance with the provisions to assist defense this administrative region of the plant fire safety supervision and management.
The five nuclear power plants operating unit (hereinafter referred to as operating unit) should fire the People's Republic of China law and the present provisions, the establishment of this unit of fire safety management system and job safety responsibility system, develop safety, maintenance of fire safety of nuclear power plants.
Operating unit of the legal representative of the units responsible for fire safety management work. Operating unit should establish fire safety management of institutions or equipped with dedicated fire safety management personnel.
6 nuclear power plant design, change management, acceptance of the license.
7 operating units shall be the contents of the fire protection design power plants, incorporated into the overall design of planning a nuclear power plant project.
The provisions referred to in the nuclear power plant design including the plant layout, fire safety, fire service, fire station fire, fire engines, fire prevention Division, building fire resistance, fire detection and fire alarm, fire sprinklers and fire-fighting equipment, fire safety planning and fire protection design.
The provisions referred to in the nuclear power plant engineering including the nuclear Island, as well as supporting the conventional island project.
Article 8 of the nuclear power plant design should comply with the national fire protection for works of building fire technology standards and plant engineering construction standard relating to design requirements, mature, advanced design technology of fire.
Design by foreign partners, the nuclear power plant project partners abroad can be used by the fire technical norms and standards, but its norms and standards cannot be lower than the relevant provisions of our country.
Article IX preliminary fire design into a nuclear power plant design and construction design.
Operating unit should follow the provisions apply for and obtain a preliminary design of licenses and permits for construction design. Has not obtained the permission of the preliminary design, operating unit shall organize the plant construction and design; design without obtaining construction licenses, operating unit shall organize the plant engineering and construction of the main fire control system.
Article 10 the preliminary design of license applications for operating unit, it shall submit to the national defense, materials of the following files:
(A) permit the preliminary design;
(2) the preliminary design of specialized documents.
Article 11 construction design license applications for operating unit, it shall submit to the national defense, materials of the following files:
(A) construction and design license applications;
(2) construction design specialized file.
Article 12, the national defense authorization of plant design, any unit and the individual will be allowed to make to the design of the fire safety features have a substantive impact or functional change of change. Do you need a change of the operating unit should follow the provisions that apply for and obtain a nuclear power plant design change license (hereinafter change of license).
Applying for changes permitted operating unit, it shall submit to the national defense, materials of the following files:
(A) the application for amendment of the fire protection design;
(Ii) fire design license file;
(C) intends to change the design of fire;
(4) shall submit the documents and materials of others.
Article 14 operating unit should choose has certain fire qualification criteria of construction and installation of units, in accordance with the nuclear power plant design license file, the Organization of the nuclear power plant in fire protection engineering construction.
Article 15 the operating unit should be installed with plant engineering and construction unit signed a written agreement, specifically nuclear power plant construction field of fire safety management responsibility.
Article 16, after the completion of the nuclear power plant fire protection engineering, operating unit shall organize self acceptance.
For automatic fire-fighting facilities containing building nuclear power plant engineering, operating unit should be entrusted with certain qualification conditions of building fire facilities detection units on building automatic fire-fighting facilities for testing, the Organization since the acceptance, and write custom inspection reports; for nuclear, conventional Island, automatic fire-fighting facilities, powerhouse to entrust building fire facilities detection unit for technical testing, operating unit should follow the debugger requires self acceptance and self inspection reports.
Plant fire works without acceptance or acceptance from is not qualified, the trading unit shall not be put into trial operation of nuclear power plants.
17 plant fire protection engineering from acceptance of the operating unit should follow the requirements for obtaining a nuclear power plant project fire inspection license. Has not obtained acceptance for nuclear power plant project fire, operating unit shall vote for nuclear power plantsInto official use.
Article 18 the acceptance for nuclear power plant project fire permits operating unit, shall submit the following documents for national defense, and materials:
(A) acceptance of the application;
(2) the report fire special acceptance;
(3) fire design license file;
(4) the report fire system acceptance;
(5) the construction and installation unit of qualification;
(6) fire protection products (including fireproof materials) testing report and fire safety report of quality acceptance;
(VII) the application of the nuclear Island, conventional island project fire design approval shall also submit the report fire hazard analysis, safety analysis for nuclear power plant final report.
XIX national defense received the preliminary design of the plant engineering, construction design license license, change the license and fire after acceptance of the application for leave, shall be in accordance with the provisions of the administrative act People's Republic of China's program review, and within the statutory time limit decided to leave. The decision to grant permission, the National Defense Committee shall make a decision within 10 days from the date of the applicant organization issuing the license file; no license decision made, it shall notify the applicant, stating the reasons, and inform the applicant of the right to request administrative review or the right to bring administrative proceedings.
Article 20, the construction and operation of nuclear power plants, nuclear plants operating unit should be strengthened to implement fire safety on fire safety in nuclear power plants, and determine the system of responsibility and their departments, job of those responsible for fire safety.
Article 21 operating unit should establish professional fire brigade, and with local government authorities, as well as local police and fire agencies fire rescue coordination mechanisms.
Article 22 operating unit should be strengthened in this unit of fire safety education and training, organize fire drills on a regular basis, increasing staff awareness of fire safety.
Article 23 of the COSTIND, provincial departments shall, in accordance with their respective responsibilities, the organization operating unit nuclear plant fire safety management conduct supervision and inspection; operating unit of upper management units should be carried out on the operating unit nuclear plant fire safety management work supervision, guidance and inspection. Check reveals a problem shall be in writing to the attention of being inspected, and the period for rectification shall be ordered.
Supervision and inspection shall include the following:
(A) fire safety management system, fire outline, fire quality assurance program, fire safety regulations for the design and implementation;
(2) the fire alarm and fire safety run record;
(3) fire safety facilities regularly inspect, test, repair and maintenance system of the establishment and implementation of fire equipment configuration and effective use;
(4) the fire action card development, validity and enforceability;
(5) fire fighting, emergency evacuation plan formulation and organization of the fire drill regularly;
(6) staff's awareness of fire safety, fire safety education and training;
(VII) fire safety important parts identification and management of corrective, fire hazards;
(8) flammable and explosive hazardous materials and storage places of fire and explosion measures of implementation;
(9) to key parts of the daily implementation of fire prevention inspections and inspection records;
(10) the establishment of the fire, sound archives.
Article 25 operating unit shall, in accordance with the requirements of supervision and inspection on corrective measures to eliminate the vulnerability or insecurity, and rectification written reports for national defense, the provinces, autonomous regions and municipalities directly under the defense industry Management Department and upper management units.
26 nuclear fire, operating unit shall, in accordance with the relevant provisions of the fire plan. When the fire resulted in the plant into the nuclear emergency State, on-site rescue work by nuclear accident emergency agencies unified command.
A general fire, operating unit should fire occur within 24 hours after the report is located, and the provincial departments of Defense and reporting; belong to a major industrial fire accident, you should immediately report the fire defense.
Article 27 operating unit under the FPPA People's Republic of China and the present provisions, has one of following behaviors, defense should be ordered to correct; overdue correction, shall be ordered to cease construction, stop use or halt, you can do fine:
(A) nuclear power plant project fire design without permission, without authorization of the construction;
(2) nuclear power plant project fire design without permission, without authorization, alter, and fire safety features of the plant have material impact or functional change;
(C) nuclear power plant project without fire since the acceptance or acceptance is not qualified, the plant put into trial operation without authorization;
(4) nuclear power plant project acceptance without fire or acceptance is not qualified, the plant allowed to go-live of;
(5) without reducing the fire technical standards of construction, the use of fire performance does not meet the national standards or industry-standard building elements and construction materials, or the use of unqualified decoration, decoration materials, construction, cause a security risk.
Article 28 the operating unit under the FPPA People's Republic of China and the present provisions, the non-fulfilment of fire safety duties, be ordered to correct; fails to correct the warning given to the unit, to the direct responsible responsible staff and other direct responsibility personnel, legally imposes the sanction.
Article 29 operating unit under the People's Republic of ChinaFire Services Act and the present provisions, the Constitution crime, legally investigates the legal responsibility.
Article 30 of the COSTIND, provincial departments of plant fire safety inspectors and control personnel, violates these provisions, the nuclear fire safety supervision and management of abuse, neglect their duties, commit fraud, serious consequences, depending on the seriousness of the case, shall be given the appropriate sanction; the Constitution crime, legally investigates the legal responsibility.
Article 31 of the decommissioning of nuclear power plants in the process of fire safety supervision and management, with reference to the regulations.
32 of these provisions as from 1 February 2007.