【 Weak current College 】 maintenance construction fire job security management---Power By 【 China power house network 】
1 in the no-fire zone fire must go through the use of fire job ticket.
2 the use of fire job ticket management
(1) the use of fire and approval of the job ticket
① premium job tickets with fire: the fire place the unit in charge of leading the first signature, by the competent security fire departments review after signing, the competent Director or Manager in newspaper divisions of final approval.
② level job tickets with fire: the fire place the unit in charge of leading the first instance, after signing the report fire departments in charge of final approval. ③ levels job tickets with fire: the fire place the unit to which the competent leadership of final approval.
(2) the use of fire job ticket validity period
① Special fire job ticket and level the use of fire job ticket valid for a period of 24 hours.
② secondary fire job ticket valid for a period of 120 hours.
(3) the use of fire job ticket by fire units specified fire project leader.
(4) a fire job ticket in a fire point of use after the fire, with fire in the use of fire job ticket. If in the same fire place more than one person at the hot job, you can use a job ticket with fire, but to all fire fire operations should be in the use of fire job ticket.
(5) the use of fire job ticket transferable, altered, is not permitted to use or extend the use of offsite.
3 gas sampling and analysis
(1) fire jobs on-site gas sampling and analysis should be qualified.
(2) General in fire operations carried out within 1 hour prior to sampling and analysis.
(3) gas sampling and analysis should be personally on-site sampling and analysis and the use of fire job tickets on sampling and analysis time, analyze the results of the last fire analysis shall also confirm signing.
4 the strict implementation of "three fire" System.
5 hot job security fire prevention requirements
(1) where a container or containers over chemical dangerous goods containers, equipment, pipelines, production, storage devices, must be cleaned before hot work operations, after analyses of qualified replacement before hot work operations.
(2) conducted in high-altitude, hot jobs, such as the lower floor there combustibles, manhole, trench, dip, etc., you should check the analysis, and take measures to prevent the spark landed fire and explosion.
(3) removal of a pipeline fire jobs, you must first identify their internal media and trends and to develop appropriate security measures.
(4) in the ground around a hot jobs, such as a fuel, fire precautions should be taken.
(5) in flammable and explosive of pipelines, vessels, tanks, and other production facilities on hot jobs, you must associate it with a production system completely isolate and clean replacement, sampling and analysis of qualified before hot work operations.
(6) hot job site through exhaust to good. Five or more than five-level wind to ban open fire weather. Due to production needs is necessary when hot jobs, hot job should upgrade management.
(7) factory pipe Gallery on hot jobs, job management by level fire. With pressure not replacement hot job by super hot job management.
(8) should be cleared before hot work fire scene and the surrounding flammable, or take other effective security fire prevention measures, equipped with sufficient applicable fire equipment.
(9) when the production is not stable or equipment, pipes, etc. are not permitted to carry out serious corrosion under pressure not replacement hot jobs.
(10) on the super hot jobs, hot jobs, workshop leader, hot jobs and passive safety of fire operation unit, plant-level fire departments in charge of safety, the competent Director or head to the scene, chengshi must, if necessary, the fire brigade to the scene to monitor on a full-time basis.