【 Weak current college 】 building engineering fire acceptance what material should be provided to the inspection unit


Applying to the program tells you:
A report prepared for the Tribunal, decoration materials

1, for approval of the application (owners seal)
2, the construction safety measures (building construction company seal)
3. fire safety provisions (building construction company seal)
4, electricity, fire safety systems (building construction seal)
5. construction organization plan (building construction seal)
6, renovation renovation scheme 2 (design company seal)
7. the construction interior trim design fire safety audit returns 2 (owners seal)
8. power of Attorney (owners seal)
9, trustee of your ID card
10, the original building fire acceptance of submissions
11, security, fire safety responsibility (party a party b owners: building construction company seal)
12, design organization scheme 2 (cover design)
A copy of the original figure 13, 1 set
14, interior decoration construction plans and drawings, blueprints for fire (cover the annual applying dedicated chapter of drawings)
1) design description 3 indoor floor plan 2)) ceiling-mounted Figure 4) ground Figure 5) electrical diagram 6) drainage) 7) air conditioning Figure 8) smoke Figure 9) fire figure 10) fire control system diagram
Second, after examination by the fire, the Fire Services Department will give you a certificate, then you'll find a construction of fire company to you.
Third, the construction is finished, you'll have a home inspection companies give you detect electrical system and fire protection systems, qualified will produce two qualified report.
4. then you begin to prepare for fire information and acceptance as follows:
1. acceptance of construction units (seal)
2. the construction units to fill in the Declaration of acceptance of construction engineering fire "(duplicate)
3. construction of buildings in fire department fire design audit files (copy)
4. fire detection mechanism inspection report (original)
5. return of decoration materials on completing (wallpapers, carpets, fabrics) needs to provide its inspection report (copy)
5. return reports if after a fire department, fire department to acceptance, acceptance, back to you (fire acceptance certificate)