Sunday, February 5, 2012
【 Weak current College 】 fire engineering installation technology gives the low-down-Power By 【 China power house network 】
Technology gives the low-down the records table C2-1 number, project name gives the low-down on the construction unit sub-item project name to give the low-down the feeds low-down: fire engineering installation of universal scope 1 this craft standard applicable to industrial and civil building fire equipment installation engineering. 2 construction preparation 2.1 construction design of fire design drawings, you must have the appropriate design qualification certificate of design unit design. The construction drawings and information will be sent to public security and fire fighting supervisory body audit, approved by the audit. 2.2 engaged in fire-fighting facilities construction units, should have the appropriate qualification, their qualification by the public security fire agencies with the relevant departments to jointly approved and issued a fire protection engineering construction Enterprise qualification certificate. 2.3 construction field of fire safety by the construction of the units responsible. Pre-construction and construction units must be reported to the police and fire agencies, the public security agency issuance of permits for the construction site before construction of fire safety. 2.4 construction units must be in accordance with the approved design drawings, not tampered with. 2.5 installed fire products, mechanical and electrical products and materials to meet the following criteria: version 2.5.1 of the city of fire Eagle, should have a production license issued by the State. Foreign or foreign to local sales of fire protection products, must have a validity period of the sales control certificate in Beijing. Selection to the Tribunal that the products listed in the certificate is in line with the desired product. 2.5.2 fixed fire extinguishing systems and fire-resistant components and refractory coatings should have effective national quality inspection center of inspection reports. 2.5.3 fire electronic products to have a valid national fire electronic products quality inspection report. 2.5.4 selection of high-voltage Cabinet and cage screen must follow the machinery Department and Ministry-approved designated plant production products; import of electrical products must have a verification certificate, they have a certificate that the device has a nameplate. 2.5.5 construction electrical construction-to-use products such as wire and cable, switches, etc., should be consistent with the safety of China electrical Certification Committee, its certification requirements for electrical product safety certification Committee on should a security certification requirements, its electrical product safety certification mark shall carry, and has a certificate that has a nameplate on your device. 2.5.6 selection of various types of steel, shall meet the relevant standards and design requirements, manufacturers to produce material certificates and certificate. 2.5.7 various main accessories, pipes, welding rods, paint, etc., should have the certificate of quality. Selection of the machines must 2.6 meets the technical requirements of the construction site, the use of mandatory testing and non-mandatory testing of the measuring instrument shall be adjusted according to the national measurement Act at the request of management. 2.7 construction management personnel, such as construction, quality inspector, materials such as operationalizing certificates. Special types, such as electricians, welders, etc. should also be done certificates. 2.8 construction should accept firefighting supervisory authority and quality supervision authorities and other superior unit check instructions to ensure the quality of the project. 2.9 construction should be strictly in accordance with the approved design drawings, conscientiously implement the relevant fire design specifications, construction approval standard, construction technology and related Atlas, manufacturer information, and other construction requirements. 2.10 construction records and data collection, arrangement and fill out the form, you should do and engineering, project completion and acceptance of delivery time should be directed to the construction of a complete set of project information, and in accordance with the contract requirements, draw the as-built drawings. 2.11 fire engineering installation and debugging all completed, construction unit should be from a qualified surveyor, then please construction units (supervision), design units for acceptance, acceptance certificate of completion. 2.12 building units or construction unit should be entrusted to qualified building fire facilities detection unit tests and submit the technical test report. 2.13 construction unit should fire supervision agencies submit an application to and acceptance of the relevant information, the public security fire agencies, the fire engineering acceptance inspection issued to fire facilities only allow acceptance certificate, otherwise, the unqualified acceptance or non-acceptance shall be permitted to use. Person who accept to give the low-down the person gives the low-down
Labels:
[:]
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment